What's New
|
Warren Access work with HSE | |
|
Do You Carry Out Refurbishment Work? | |
|
IPAF Training Dates 12th – 18th January 2012 |
Case Studies
Portland Consulting were working alongside Jones Lang Lasalle. They used Warren Access to hire a lorry mounted access platform with 13m outreach for the initial assessments to get underway.
Read more...Christmas Plus were approached by Alnwick Gardens to install their latest LED lights to an evergreen tree outside the Alnwick Garden Tree House. They contacted Warren Access, and following a site meeting, the solution was the use of the 27m Multitel Platform.
Read more...North East CCTV specialist 2020 Vision is the first company to use new state of the art access equipment provided by Warren Access.
Read more...Due to weather damage at King Edward & Priors House apartments in Tynemouth, all windows needed replacing front and back on both blocks…
Read more...A David Bowie Tribute Band from Cambridgeshire were touring the North East in the summer of 2007 and were looking for diverse images of their band for promotional material…
Read more...With the amendment of the Work at Height Regulations in 2007, it was necessary for many jobs that may have previously been carried out with the use of ladders to be completed by other means…
Read more...Alnwick Castle and the surrounding historic buildings require continuous upkeep, and some key areas that need recurrent attention are; monitoring for cracks in walls and regularly de-scaling and re-pointing them…
Read more...Portland Consulting were working alongside Jones Lang Lasalle. They used Warren Access to hire a lorry mounted access platform with 13m outreach for the initial assessments to get underway.
Read more...Christmas Plus were approached by Alnwick Gardens to install their latest LED lights to an evergreen tree outside the Alnwick Garden Tree House. They contacted Warren Access, and following a site meeting, the solution was the use of the 27m Multitel Platform.
Read more...North East CCTV specialist 2020 Vision is the first company to use new state of the art access equipment provided by Warren Access.
Read more...Due to weather damage at King Edward & Priors House apartments in Tynemouth, all windows needed replacing front and back on both blocks…
Read more...A David Bowie Tribute Band from Cambridgeshire were touring the North East in the summer of 2007 and were looking for diverse images of their band for promotional material…
Read more...With the amendment of the Work at Height Regulations in 2007, it was necessary for many jobs that may have previously been carried out with the use of ladders to be completed by other means…
Read more...Alnwick Castle and the surrounding historic buildings require continuous upkeep, and some key areas that need recurrent attention are; monitoring for cracks in walls and regularly de-scaling and re-pointing them…
Read more...Portland Consulting were working alongside Jones Lang Lasalle. They used Warren Access to hire a lorry mounted access platform with 13m outreach for the initial assessments to get underway.
Read more...Christmas Plus were approached by Alnwick Gardens to install their latest LED lights to an evergreen tree outside the Alnwick Garden Tree House. They contacted Warren Access, and following a site meeting, the solution was the use of the 27m Multitel Platform.
Read more...North East CCTV specialist 2020 Vision is the first company to use new state of the art access equipment provided by Warren Access.
Read more...Due to weather damage at King Edward & Priors House apartments in Tynemouth, all windows needed replacing front and back on both blocks…
Read more...A David Bowie Tribute Band from Cambridgeshire were touring the North East in the summer of 2007 and were looking for diverse images of their band for promotional material…
Read more...With the amendment of the Work at Height Regulations in 2007, it was necessary for many jobs that may have previously been carried out with the use of ladders to be completed by other means…
Read more...Alnwick Castle and the surrounding historic buildings require continuous upkeep, and some key areas that need recurrent attention are; monitoring for cracks in walls and regularly de-scaling and re-pointing them…
Read more...Downloads
Here you will find helpful advice on health and safety as well as information about different work regulations. All of this information can be downloaded for you to keep.
Warren Access Account Application
Account Application FormDownload and print our application form to setup a Warren Access Account… |
Downloads
IPAF Terms & ConditionsAs of 1st March 2010 we will be adopting the IPAF Terms & Conditions… |
LOLER Regulations 1998This guide provides information about the legal requirements of the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) which came into force on 5 December 1998. |
Risk Assessment FormOur current Risk Assessment Form… |
Health & Safety TipsCheck out our Health & Safety tips for Mobile Elevated Work Platforms… |
Work at Height Regulations 2005In 2005/06 falls from height accounted for 46 fatal accidents at work and around 3350 major injuries. They remain the single biggest cause of workplace deaths… |
Safety HarnessesIt is strongly recommended that a full body harness with an adjustable lanyard is used when… |
Preventing Falls from MEWPSThe risk of falling from a MEWP is from sudden movements caused by an impact, ground movement, failure of a stability critical part, or overreaching… |
Account Application Form
IPAF Terms & Conditions
LOLER Regulations 1998
Risk Assessment Form
Health & Safety Tips
Work at Height Regulations 2005
Safety Harnesses
Preventing Falls from MEWPS



